I use Westside Lexus in Houston and put my deposit down in October 2024. At the time they said it would be 5 months. It has now been 8 months and still waiting.
I am a long-time Lexus and Toyota fan and currently have a 2019 GX 460. I wasn't sure I liked the body style of the new GX550, but was ready for a change and after the test drive, I wanted it. Put down and deposit in October 2024 and was told 5 months. Still waiting 7 months later and with...